Technical Data | |
---|---|
Customer | JV BONATTI J&P AVAX S.r.l. |
Year | 2017-18 |
Place | Greece |
End User | Trans Adriatic Pipeline AC |
Title | EPC ONSHORE PIPELINE CONSTRUCTION TAP PROJECT SECTION 2&3 |
Description | Engineering & Fabrication of eight Launchers & eight Receivers and twenty two Hydrotest Heads |
Type of Activities | Pre-commisioning Activities and Commissioning Assistance |
Type of Project | Mechanical – Equipment supply |
Scope of Supply
Engineering
- Engineering of Headers
- Verification of Design
- Construction Drawings
Quality
- ITP and Quality Procedures
- Welding Procedures WPS/ PQR/ WQR
- Manufacturing Data Book (including certificates NDT reports, welding procedures, Welding Map, Pressure Test Report, NDTs certificates)
- Third Party Inspections at any stage of Engineering, Quality, Procurement, and Fabrication
Procurement of material (EU origin)
- Supply of 56’’ Barrel Materials, Flanges, Nozzles, Piping (as shown in provided drawing)
- Supply of Structural Materials (Saddles, base plates, supports)
- All the other materials according to drawings
Fabrication
- Fabrication of Headers, Nozzles and Piping
- Assembly and Welding of Nozzles on the Shell