Technical Data | |
---|---|
Customer | Motor Oil (Hellas) – Corinth Refineries S.A. |
Year | 2014 |
Place | Greece |
End User | Motor Oil Hellas (Hellas) – Corinth Refineries S.A. |
Title | Visbreaker Unit Revamping |
Description | Visbreaker Unit Revamping |
Type of Activities | Pre-commisioning Activities and Commissioning Assistance |
Type of Project | Mechanical – Electrical |
Scope of Supply
Dismantling of existing piping.
Connection of all necessary process and utility piping to the battery limits of the new Furnace F-151, and pre-commissioning of same. Erection of the new furnace F-151 by others.
Erection and pre-commissioning of new new Soaker V-115N, filters S-102A/B, and decoking drum V-112N.
Installation and pre-commissioning of all other new equipment and accessories associated with the Visbreaking Unit revamping.
Fabrication and installation of all new piping and tie-ins (only the piping tie-ins that it is indicated to be performed during final shutdown.
Fabrication and installation of all ancillary facilities.
Supply of material, fabrication, and installation of all piping supports.
Painting of pipe supports and piping, and touch-up painting of steel structures and equipment, as required.
Necessary non-destructive examinations and testing.
Necessary scheduling, reporting, engineering, lifting and transportation studies, and documentation including As-built dwgs.
Coordination with all other contractors on the job.
Necessary lifting and other equipment and facilities, scaffolding, consumables, etc.
Necessary labor and site supervision.
All required works and supply of everything else necessary for a complete installation.